Projects - click a project name for more images

Client:
Blanalko
Contract value:
$8 million +
Description:
Rail Terminal Construction
Duration:
3 years + (ongoing)
Scope of works:
  • Rail formation
  • Stormwater
  • Shunt Paths
  • Roadway
  • Building Earthworks
  • Container Payment Construction

 

 

Timelapse of Storm Water Crossing constructed within a stringent  24hour period:

 

 

 

 

Client:
DPTI - Department of Planning, Transport and Infrastructure
Contract value:
$170,000
Description:

Construction of gabion basket weir with trash rack in a natural waterway.

Duration:
3 weeks
Scope of works:

DPTI engaged Davison Earthmovers to undertake work involving :

  • Liaising with DPTI and ARTC to determine methodology to complete works in between train movements including establishment of plant and materials into a 30m deep valley accessible only from rail corridor.
  • Removal of built up vegetation and debris from pipe entry
  • Re-shaping the pipe inlet floor
  • Installation of gabion rock matresses and overflow weir (total 300t of rock)

In order to achieve the required outcome an innovative method for establishment into the site was required involving:

  • Helicopter lifting of earthmoving plant into and out of the valley floor.
  • Use of geofabric slipway for establishment of gabion rock onto valley floor from elevated rail position.
  • Coordination with DPTI equipment including use of hi-rail side tippers.

Use of rubber tyred excavator for access through rail corridor and placement of rock and other materials onto slipway

 

 

 

Client:
Cirque Du Soleil
Contract value:
$700,000
Description:
21,000m2 rubble and asphalt hard stand installed to tight level controlfor establishment of temporary circus tent structure and facilities. 
Duration:
Install: 2 weeks, Removal: 2 weeks
Scope of works:

INSTALL

  • Placement of geotextile layer over parkland containing contaminated soil.
  • Installation of rubble pavement and asphalt surfacing using 3D robotic grader control systems.
  • Installation of fround improvement flocks and screw pile foundations for anchoring tent structure.
  • Install communications conduits and pits.

REMOVAL

  • Removal and recycling of;   1,000t asphalt   and   8,500t quarry rubble
  • Return of parkland surface to original condition.
  • Extraction work completed under tight time frame guidelines.
Client:
Mackenzie Intermodal
Contract value:
$3 million
Description:
Upgrading and extending existing Train Freight Spur Line.
Duration:
3 Months
Scope of works:
  • Construction of 26,000m2 Heavy Duty Pavement area
  • Stormwater construction
  • Security Fencing
  • Concrete construction

 

Client:
Soil and Groundwater
Contract value:
$250,000
Description:
Groundwater contamination barrier
Duration:
3 months
Scope of works:

Excavate and construct a 7 metre deep bio-media barrier for contaminated water.

Client:
-
Contract value:
$1.2 million
Description:
Bulk earthworks to form 5 water storage lagoons
Duration:
20 weeks
Scope of works:
  • Live stormwater and waste water management throughout project
  • Electical upgrade and installation of aeration and dissolved oxygen metres
  • Placement of 40m of 600mm diameter RCP
  • HDPE lining to 8000 square metres of lagoon.
  • Installation of transfer pipe works

 

Client:
John Hollland, Coleman Rail, Downer, Transfield Services, Lang O'Rourke, DPTI, SCT
Contract value:
Various
Description:
-
Duration:
4 hours - 6 months
Scope of works:
  • Services Installation
  • Stormwater
  • Formation construction
  • Decribbing
  • Ballast removal, placement and cartage
  • Rail construction
  • Rail logistics
  • Shunter path installation
  • Ground stabilising
Client:
DPTI
Contract value:
$70,000
Description:
Stabilise embankment
Duration:
2 weeks
Scope of works:
  • Construct gabion baskets
  • Placement of rip rap bags to stabilise bank
  • Backfill with no fines concrete
Client:
Hansen Yunken
Contract value:
$1.1 million
Description:
Associated earthworks with building construction
Duration:
52 weeks
Scope of works:
  • Bulk earthworks to building plateau
  • Contamination testing and stockpile management
  • Underground water storage tank installation
  • Roadways and paving preparation
  • Stormwater culvert installations and connections

 

Client:
J&L Davison Investments
Contract value:
$1 million
Description:
Groundwater remediation and construct subdivison
Duration:
18 months - current
Scope of works:
  • Groundwater remediation
  • Rehabilitation of old counctil storage yard for residential development (7,500 sq. m)
  • Well Pointing and re-injection of filtered groundwater as targeted treatment of fuel plume
  • Construct services
  • Construct roadway and verges
  • Block bulk fill and compaction